The new floor is in on the Great American Desert kitchen/living room remodel. Took longer than I wanted, but it looks great. Next step is the finish work, caulking, shoe molding, touch up shellac on the existing trim, etc. Then back onto the island design/creation.
Sounds like everything is pretty well ready to go on my own build once I return. With luck the month plus I will be back on site will lead to several posts going up, and perhaps even a couple of roof girders going into place. Because of the all too necessary work schedule, I expect to be building into the fall this year, but as long as I can get it closed in, and get a wood stove installed, I will be spending the winter in my own home, rather than in my tiny caravan.
No comments:
Post a Comment